Site start
Housing site start — Dublin
Dublin
1 commencement notice · start date 23 Apr 2019 · planning reference given
Planning 3271/18
- Commencement notices
- 1
- Latest start date
- 23 Apr 2019
- Latest notice
- 8,000 m²
- Planning reference
- 3271/18
- Location
- Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Enabling works consisting of: demolition (in full) of the existing office & residential block at the Haymarket Site inclusive of the basement ( 1-6 Haymarket, 56-58 Smithfield including Smithfield Chambers), provision of associated hoarding and also provision of temporary stays for the Luas OHL (ahead of demolition of the existing building block currently providing support) with associated works. The site was formally known as the Tully Site. The demolition duration is approx. 5-6 months. All of the works above will not form a part of the permanent structure of the Mixed Use Office Development (Building) planned to be constructed on this site once enabling works completed. Mixed Use Office Development (Building) will be a subject of a separate Commencement Notice with documentation (Long Form).
Floor area stated for this source: 8,000 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.