Site start
Housing site start — Monkstown
Monkstown, Dublin
1 commencement notice · start date 20 May 2015 · planning reference given
Planning D14B/0255 · Planning application
- Commencement notices
- 1
- Latest start date
- 20 May 2015
- Latest notice
- Scale not stated
- Planning reference
- D14B/0255
- Location
- Monkstown, Dublin
Commencement and completion records
Planning, start and completion
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Planning applications
- Links to official records
- 0
- Links between applications
- Repeat copies merged
- Completion certificates
Location
Where the site is
- Area
- Monkstown, Dublin
- County
- Dublin
Addresses on the notices
- Knocknagow House, Greenville Rd, Monkstown, Co
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The project comprises of the partial demolition and renovation of an existing domestic dwelling and construction of a new low energy extension at Knocknagow House, Greenville Rd, Monkstown, Co. Dublin. The purpose of the project is to renovate the premises and to produce a low energy requiring premises. There are a number of elements within the project to extend the existing building: - The demolition of the existing extension and much of the existing main house. - A number of internal walls are to be relocated. - Existing external walls are to be clad with 200mm of external insulation. - Construction of a new low energy extension and strengthening works where required of the existing main house.
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.