Site start

Building extension site start — Dublin

Dublin 12, Dublin

1 commencement notice · start date 06 Aug 2018 · planning reference given

Planning 2946/18

Commencement notices
1
Latest start date
06 Aug 2018
Latest notice
317 m²
Planning reference
2946/18
Location
Dublin 12, Dublin

Location

Where the site is

Area
Dublin 12, Dublin
County
Dublin

Addresses on the notices

  • the end of the counter and in the ladies toilets
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

7-Day Notice - Works include the installation of new emergency & general lighting, the installation of a new fire alarm, laying of floor finishes, installation of prefabricated feature joinery items such as Balustrades, Coffee Counter, Screens etc, internal decoration & installation of fixed & loose furniture and the installation of new accessible WC, new stud walls will be built at the end of the counter and in the ladies toilets. Works also include the removal of 5 No windows and the walls below removed to the floor to allow full access to a new single story glazed extension with new door.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 317 m².

Planning reference 2946/18

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.