Commencement notice group

Building extension commencement notices — Tralee

Tralee, Kerry

1 unique commencement event · latest notified commencement 29 Mar 2019 · planning reference supplied

Unique commencement events
1
Latest notified commencement
29 Mar 2019
Latest notice
942 m²
Planning references supplied
248275
Public location
Tralee, Kerry

Commencement and completion records

Planning, start and completion evidence

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Exact planning records
Official record actions
0
Explicit planning relationships
Duplicate source rows consolidated
Exact completion events

Planning-anchored public geography

Site identity and location

Canonical public locality
Tralee, Kerry
County
Kerry

Notice location variants

  • Gr Floor Level And 4 No CN0050207KY
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0050207KY BCMS open-data feed

The Construction Of A Two Storey Extension To The Existing School With Provision For A Special Education Needs Unit At Gr Floor Level And 4 No. Main Stream Classrooms At 1st Floor Level And All Associated Circulation, Services And Sanitary Facilities With An Enclosed Bridge Link At 1st Floor Level Connecting The Existing School To The New Extension, including Alternations And Elevational Changes To The Existing Building Including The Construction Of A Single Storey Extension To The Existing Main Entrance Lobby, Together with Related Services and Site Works at Scoil Mhuire na mBráithre, CBS Primary School, Brewery Road, Clounalour, Tralee, Co. Kerry

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 942 m².

Planning reference 248275

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.