Commencement notice group
Building extension commencement notices — Greystones
Greystones, Wicklow
1 separate notice · latest notified commencement 11 Jul 2025 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 11 Jul 2025
- Latest notice
- 1 unit
- Planning references supplied
- 24/150
- Public location
- Greystones, Wicklow
Public source geography
Site location
- Public site / locality
- Greystones, Wicklow
- County
- Wicklow
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
The exact official planning file is available below.
-
Official planning file Application details, decision and available documents Wicklow County Council · reference 24/150 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Removal of modern conservatory to the side at the first floor, demolition of the old extension to the side at the ground floor level and the construction of a two-storey extension to the side including external access staircase and balcony, solar panels to the concealed valley on the roof and all ancillary works. This is a protected structure at Cartref, Rathdown Road, Greystones, Co. Wicklow
1 unit · 30 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.