Site start

Housing site start — Dublin

Dublin 3, Dublin

1 commencement notice · start date 19 Aug 2026 · planning reference given

Planning WEB2734/25 · Planning application

View full project timeline

Commencement notices
1
Latest start date
19 Aug 2026
Latest notice
230 m²
Planning reference
WEB2734/25
Location
Dublin 3, Dublin

Location

Where the site is

Area
Dublin 3, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

The development consists of the refurbishment of the existing two storey semi-detached house, and rear return including: (i) Demolitions and alterations including the partial raising of the ceiling and provision of new partitions to the lower ground floor rear return to relocate the kitchen/dining area, and provide a new utility room and shower room; partial opening up of the underside of the first flight of stairs; (ii) Raising the flat roof (and to include a new flat rooflight) over the existing store and boiler room to the lower ground floor rear return, to become part of the new kitchen space; (iii) Changes to the windows and doors to side and rear facades of the ground floor rear return including: Replacement of two existing windows, alteration of two window and door openings, removal of five window and door openings (including clerestorey to the rear hallway) and provision of four new window & door openings (iv) Internal alterations to the first floor rear return to remove the hot press and storage cupboard, and provide a new bathroom layout; (v) Demolitions and Internal alterations to the first floor to allow a new layout for the en suite and new interventions to provide built in wardrobes serving the master bedroom; and including the insertion of a new glazed door to the existing arch on the first floor landing; (vi) Internal repairs, new finishes and fittings including tiling to the front hallway; (vii) Repair and repointing of existing brickwork and provision of new stone plinth to the rear return facades; (viii) Thermal upgrading of the house to include - Internal wall Insulation to the rear return at ground and first floors; Insulating the existing suspended timber floor to the main house; Removal of existing concrete floor and provision of new insulated concrete floor to the ground floor rear return; New insulation and ventilation to the main and rear return roofs; (ix) Rewiring of the electrical system and installation of solar panels to the southern r

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 230 m².

Planning reference WEB2734/25

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.