Site start

Building extension site start — Ballinfull

Ballinfull, Sligo

1 commencement notice · start date 08 Jul 2025 · planning reference given

Planning 2460348 · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
08 Jul 2025
Latest notice
Scale not stated
Planning reference
24/60348
Location
Ballinfull, Sligo

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Ballinfull, Sligo
County
Sligo

Addresses on the notices

  • Doonfore, Co
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Sligo County Council planning record Application details, status and decision record for 24/60348. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Refurbishment and extension to an existing cottage consisting of; the demolition of existing flat roof structure and existing sheds to the rear, construction of a pitched roof extension the the northern boundary and flat roof structure to the rear, finishes to match the existing, and all associated site works at Doonfore, Co. Sligo F91 X97.

Work stated for this notice Scale not stated for this notice.
Planning reference 24/60348

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.