Site start
Building extension site start — Malahide
Malahide, Dublin
1 commencement notice · start date 26 Jun 2023 · planning reference given
Planning F22A/0667 · Planning application
- Commencement notices
- 1
- Latest start date
- 26 Jun 2023
- Latest notice
- Scale not stated
- Planning reference
- F22A/0667
- Location
- Malahide, Dublin
Location
Where the site is
- Area
- Malahide, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Proposed second floor extension (65m²) housing master bedroom and lounge with north facing balcony in roof eaves. Replacement of existing brick parapets (ridge 7.75m), pitched roofs and flat roof, with new straight pitched roof, (ridge 9.06m); rooflights to east & west, photovoltaic array to west. Existing brick stair tower to be clad in natural timber & increased vertically with new flat dormer roof (7.65m). Increased balcony to the south elevation. Demolition of existing rear ground floor extension to west. Internal reconfiguration and associated window realignment with sections of timber panelling, and green living-wall to all elevations; and all associated site works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.