Site start
Housing site start — Dublin
Dublin 14, Dublin
1 commencement notice · start date 25 May 2018 · planning reference given
Planning D18B/0067 · Planning application
- Commencement notices
- 1
- Latest start date
- 25 May 2018
- Latest notice
- Scale not stated
- Planning reference
- D18B/0067
- Location
- Dublin 14, Dublin
Location
Where the site is
- Area
- Dublin 14, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Permission for the demolition of an existing single storey sunroom (c.9 sqm) and the construction of a part single storey part two storey pitched roof side extension and single storey flat roof rear extension including minor modifications to the front elevation of the existing dwelling and all associated site works and site services.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.