Commencement notice group
ground floor level from office to hotel use at no — commencement notices
Waterford, Waterford
1 separate notice · latest notified commencement 06 Feb 2025 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 06 Feb 2025
- Latest notice
- 1,863 m²
- Planning references supplied
- 21902
- Public location
- Waterford, Waterford
Public source geography
Site location
- Public site / locality
- Waterford, Waterford
- County
- Waterford
Public site labels seen across the notices
- ground floor level from office to hotel use at no
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
The exact official planning file is available below.
-
Official planning file Application details, decision and available documents Waterford City and County Council · reference 21902 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
(a) the change of use at ground floor level from office to hotel use at no. 36 The Mall (PROTECTED STRUCTURE RPS: 260) and the forming of 2 no. internal openings to link to existing hotel, (b) the demolition of existing single storey modern extensions (not original fabric) to the rear of no. 16, 17 & 18 Lombard Street and the demolition of 3 storey modern extension to the rear of no. 19 Lombard Street, (c) the demolition of existing ground floor kitchen, chef area, toilets, ancillary accommodation and yard store at The Tower Hotel together with the demolition of existing two storey laundry and store building to the rear, (d) the construction of a new 4 storey extension to The Tower Hotel fronting Rose Lane consisting of 21 no. guest bedrooms, laundry rooms, service yard, staff facilities and changing, office, kitchen, display area and ancillary accommodation and (e) alterations to front elevation of The Tower Hotel at The Mall including the construction of a new outdoor terrace with retractable awning and glazed balustrade.
1,863 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.