Commencement notice group

Housing commencement notices — Dublin

Dublin 7, Dublin

1 separate notice · latest notified commencement 04 Jun 2026 · planning reference supplied

Source notices
1
Latest notified commencement
04 Jun 2026
Latest notice
25 m²
Planning references supplied
WEB5141/25
Public location
Dublin 7, Dublin

Public source geography

Site location

Public site / locality
Dublin 7, Dublin
County
Dublin
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning referenceWEB5141/25

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0142823DC BCMS owner-supplied export

The demolition of existing singlestorey structures to the rear of the house, the construction of a twostorey extension the rear of the house with single- storey to the side, the construction of one gable window at first-floor and one gable window at attic level, the construction of a dormer window in the main roof to the rear of the house.

25 m² · stated on this notice

Planning reference WEB5141/25

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.