Site start
Building extension site start — Blackrock
Blackrock, Dublin
1 commencement notice · start date 22 Jun 2015 · planning reference given
Planning D10A/0689 · Planning application
- Commencement notices
- 1
- Latest start date
- 22 Jun 2015
- Latest notice
- Scale not stated
- Planning reference
- D10A/0689
- Location
- Blackrock, Dublin
Location
Where the site is
- Area
- Blackrock, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Development consisting of the extension and refurbishment of existing school including the demolition of part existing single storey buildings (part to front but primarily to rear of school), and the construction of a two storey wing in its place, and the construction to the rear, of a new two storey wing incorporating 12 new learning spaces with associated support spaces, circulation etc, a new sports hall with changing rooms and associated support spaces serving the new hall and rear playing facilities. The new sports hall is a two storey like volume and includes part two storey accommodation /viewing gallery etc. The development also includes for full disability access provisions, enhanced energy performance and the upgrading of the existing retained main school buildings , along with various associated site works including 3 new hard courts, 18 additional car parking, ESB substation and emergency vehicular access to the pitches all as described in drawings. The works will include the provision of varying numbers of temporary class rooms and school support spaces through different phases of the construction to facilitate keeping the existing school fully operational through the construction period.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.