Site start

Site start — Newbridge

Newbridge, Kildare

1 commencement notice · start date 07 Sep 2026 · planning reference given

Planning P92022.21

Commencement notices
1
Latest start date
07 Sep 2026
Latest notice
2,300 m²
Planning reference
P92022.21
Location
Main Street, Newbridge, Kildare

Location

Where the site is

Area
Newbridge, Kildare
County
Kildare

Addresses on the notices

  • Main Street, Newbridge, Kildare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Newbridge Library – Construction of a new 3-storey library building and refurbishment of the existing 2-storey protected library building and associated works, including the construction of a new bin store and localised works to the Riverbank Arts Centre.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 2,300 m².

Planning reference P92022.21

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.