Site start
Housing site start — Malahide
Malahide, Dublin
2 commencement notices · latest start date 28 Oct 2015 · planning reference given
Planning F14A/0168 · Planning application
- Commencement notices
- 2
- Latest start date
- 28 Oct 2015
- Latest notice
- Scale not stated
- Planning reference
- F14A/0168
- Location
- Malahide, Dublin
Location
Where the site is
- Area
- Malahide, Dublin
- County
- Dublin
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Part single and part 2-storey, 3-4 bedroom dwelling in conjunction with existing garage/store on existing land by sub- division with a retaining wall and upgrade of vehicular access and gates. House Construction
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
Part single and part 2-Storey, 3-4 bedroom dwelling in conjunction with existing garage/store on existing land by subdivison with a retaining wall and upgrading of vehicular access and gates. SITE WORKS ONLY THIS PHASE TO FACILITATE DIVISION OF EXISTING SITE
Overall development total stated in source: 1 house.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.