Housing commencement notices — Knockdrin

Knockdrin, Westmeath

1 separate notice · latest notified commencement 20 Sep 2016 · planning reference supplied

Source notices
1
Latest notified commencement
20 Sep 2016
Latest notice
4 homes
Planning references supplied
15/6194
Public location
Knockdrin, Westmeath

Public source geography

Site location

Public site / locality
Knockdrin, Westmeath
County
Westmeath
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning reference15/6194

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0020570WH BCMS owner-supplied export

Attic conversion which consists of 3 no. bedrooms, stairs, landing, bathroom and wardrobe with 4 no. velux windows at the rear of our dwelling and to construct an extension to the side to include a new kitchen and dining on ground floor and 1 no. bedroom on first floor and chimney and install a treatment system with percolation aea with all ancillary site works with all ancillary site works with opt out declaration

4 homes · stated on this notice

Planning reference 15/6194

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.