Commencement notice group

the rear of the site to the main Care Centre building — commencement notices

Longford, Longford

1 separate notice · latest notified commencement 30 Oct 2024 · planning reference supplied

Source notices
1
Latest notified commencement
30 Oct 2024
Latest notice
305 m²
Planning references supplied
20/170
Public location
Longford, Longford

Public source geography

Site location

Public site / locality
Longford, Longford
County
Longford

Public site labels seen across the notices

  • the rear of the site to the main Care Centre building, construction of a new carpark on east side of the camp
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

The exact official planning file is available below.

  • Official planning file Application details, decision and available documents Longford County Council · reference 20/170 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external
Planning reference20/170

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0121585LD BCMS open-data feed

Construction of a new single storey extension to provide a new 43 bed residential unit on the west side of the campus incorporating en-suite bedrooms, day rooms, dining rooms, activity and therapy rooms, staff support rooms, a new vehicular and pedestrian entrance to the Care Centre, construction of new single storey extension to provide a new energy centre, construction of new single storey building complex to the south of the campus incorporating maintenance facilities, ESB transformer and external compound, part refurbishment of the existing residential/miscellaneous accommodation including construction of a new single storey link building connecting residential accommodation at the rear of the site to the main Care Centre building, construction of a new carpark on east side of the campus, reconfiguration of the existing access road network and associated landscaping works. Application includes the Retention of the existing cabins to the front of the outpatients building. Associated site works include the demolition of a St Teresa’s residential unit, other residential/miscellaneous accommodation, maintenance buildings, ESB transformer building and existing central boiler house.

305 m² · stated on this notice

Planning reference 20/170

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.