Commencement notice group
Housing commencement notices — Dublin City
Dublin City, Dublin
2 unique commencement events · latest notified commencement 07 Oct 2024 · planning reference supplied
- Unique commencement events
- 2
- Latest notified commencement
- 07 Oct 2024
- Latest notice
- 189 units
- Planning references supplied
- SHD0029/20
- Public location
- Dublin City, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dublin City, Dublin
- County
- Dublin
Notice location variants
- ground floor CN0120279DC, CN0114022DC
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
(i) Demolition of the existing 3-4 storey corrugated iron industrial buildings and 2 storey dilapidated commercial buildings on site (comprising c. 3,300sq.m); (ii) construction of 189 no. Apartments (comprising 151 no. one-bed apartments, 34 no. two-bed apartments and 4 no. three-bed apartments) in 3 no. three to eight storey blocks. The development will be served by 232sq.m of communal residential amenities/facilities, including a communal lounge, multi-functional space, a concierge, a central pedestrian/cycle entrance and a delivery storage area fronting James Street; 1,457sq.m. of communal open space, including a 75sqm roof terrace and 3 no. landscaped courtyards; 257 no. bicycle spaces (218 no. resident spaces in a secure bicycle storage area and 39 no. visitor spaces at ground floor level); and 4 no. car parking spaces (including 1 no. limited mobility space, 1 no. drop-off/set-down space and 2 no. Go-Car spaces) accessible from Basin View; (iii) improvement works to existing boundary walls; and (iv) Associated site and infrastructural works are also proposed which include; foul and surface water drainage; attenuation tanks; landscaping; plant areas; ESB substations; and all associated site development works.
Floor area stated for this source: 14,621 m².
(i) Demolition of the existing 3-4 storey corrugated iron industrial buildings and 2 storey dilapidated commercial buildings on site (comprising c. 3,300sq.m); (ii) construction of 189 no. Apartments (comprising 151 no. one-bed apartments, 34 no. two-bed apartments and 4 no. three-bed apartments) in 3 no. three to eight storey blocks. The development will be served by 232sq.m of communal residential amenities/facilities, including a communal lounge, multi-functional space, a concierge, a central pedestrian/cycle entrance and a delivery storage area fronting James Street; 1,457sq.m. of communal open space, including a 75sqm roof terrace and 3 no. landscaped courtyards; 257 no. bicycle spaces (218 no. resident spaces in a secure bicycle storage area and 39 no. visitor spaces at ground floor level); and 4 no. car parking spaces (including 1 no. limited mobility space, 1 no. drop-off/set-down space and 2 no. Go-Car spaces) accessible from Basin View; (iii) improvement works to existing boundary walls; and (iv) Associated site and infrastructural works are also proposed which include; foul and surface water drainage; attenuation tanks; landscaping; plant areas; ESB substations; and all associated site development works.
Floor area stated for this source: 14,621 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.