Commencement notice group
Building extension commencement notices — Ballyragget
Ballyragget, Kilkenny
1 separate notice · latest notified commencement 17 Sep 2020 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 17 Sep 2020
- Latest notice
- 1,839 m²
- Planning references supplied
- 19/667
- Public location
- Ballyragget, Kilkenny
Public source geography
Site location
- Public site / locality
- Ballyragget, Kilkenny
- County
- Kilkenny
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
The exact official planning file is available below.
-
Official planning file Application details, decision and available documents Kilkenny County Council · reference 19/667 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Two storey extension to their existing Research and Development Facility to accommodate a pilot plant, laboratories, storage, dryer and wet process rooms, associated equipment and roof mounted air handling equipment. Alterations to the existing Research and Development Facility to accommodate the extension that includes an increase in the first floor area, alterations to northern and western elevations and installation of roof mounted air handling equipment. An extension to an existing carpark North of the site. A new carpark South of the site. Associated site works including a pipe bridge, earthworks retaining walls, pedestrian routes, drains and services including car park lighting. The extension and alterations to the existing Research & Development Facility will provide a controlled and hygienic environment for product testing and development. The new car parks north and south of the plant will replace parking spaces (57 no. spaces) removed to facilitate the extension to the Research and Development Facility and will provide an additional 54 no. spaces.
1,839 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.