Site start

Building extension site start — Ballyragget

Ballyragget, Kilkenny

1 commencement notice · start date 17 Sep 2020 · planning reference given

Planning 19/667 · Council file · external

View full project timeline

Commencement notices
1
Latest start date
17 Sep 2020
Latest notice
1,839 m²
Planning reference
19/667
Location
Ballyragget, Kilkenny

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
1
  1. Completion certificate recorded — source scope not stated Kilkenny County Council · commencement notice Completion certificate · First observed in the official monthly source 2020-09 1 units stated for this certificate · One certificate representation

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Ballyragget, Kilkenny
County
Kilkenny
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Kilkenny County Council planning record Application details, status and decision record for 19/667. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Two storey extension to their existing Research and Development Facility to accommodate a pilot plant, laboratories, storage, dryer and wet process rooms, associated equipment and roof mounted air handling equipment. Alterations to the existing Research and Development Facility to accommodate the extension that includes an increase in the first floor area, alterations to northern and western elevations and installation of roof mounted air handling equipment. An extension to an existing carpark North of the site. A new carpark South of the site. Associated site works including a pipe bridge, earthworks retaining walls, pedestrian routes, drains and services including car park lighting. The extension and alterations to the existing Research & Development Facility will provide a controlled and hygienic environment for product testing and development. The new car parks north and south of the plant will replace parking spaces (57 no. spaces) removed to facilitate the extension to the Research and Development Facility and will provide an additional 54 no. spaces.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 1,839 m².

Planning reference 19/667

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.