Site start

Commercial site start — Dublin

Dublin 8, Dublin

1 commencement notice · start date 22 Jan 2021 · planning reference given

Planning 4049/19 · Planning application

View full project timeline

Commencement notices
1
Latest start date
22 Jan 2021
Latest notice
1,408 m²
Planning reference
4049/19
Location
Dublin 8, Dublin

Location

Where the site is

Area
Dublin 8, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

The development will consist of: a new four storey laboratory building (1340m2) within the existing Coombe site with the provision of rooftop plant and 2 no. rear extensions to the existing adjacent laboratory building to include a new link, office and store (68m2) with all associated site works. This application site is in S.D.R.A. no.12, St Teresa's Gardens and Environs Strategic Development and Regeneration Area.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 1,408 m².

Planning reference 4049/19

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.