Commencement notice group
RIAM campus — commencement notices
Dublin, Dublin
1 separate notice · latest notified commencement 04 May 2026 · planning basis not stated
- Source notices
- 1
- Latest notified commencement
- 04 May 2026
- Latest notice
- 386 m²
- Planning references supplied
- None stated
- Public location
- Dublin, Dublin
Public source geography
Site location
- Public site / locality
- Dublin, Dublin
- County
- Dublin
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
The works will consist of the the internal fit-out of the third floor storey of the Teaching Block extension building which forms part of the RIAM campus at 36-38 Westland Row, Dublin, and which was completed under commencement notice CN0064378DC. Proposed works will involve the fit-out of the existing interior shell-finish to install new room partitioning to provide Practice Rooms, a Storage Room, and corridor access linking to existing stair and lift cores, with new services and finishes associated.
386 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.