Site start
Housing site start — Clondalkin
Clondalkin, Dublin 22, Dublin
1 commencement notice · start date 14 Sep 2021 · planning references given
Planning SD20A/0015 ABP-307303-20 · Council file · external
- Commencement notices
- 1
- Latest start date
- 14 Sep 2021
- Latest notice
- 21 units
- Planning references
- SD20A0015 · ABP-307303-20
- Location
- Clondalkin, Dublin 22, Dublin
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 2
- Completion certificates
- 0
- Open exact official planning record: SD20A0015 South Dublin County Council
Exact appeal 307303 · Grant permission with revised conditions · 2020-10-08 · Open official case
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Clondalkin, Dublin 22, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file South Dublin County Council planning record Application details, status and decision record for SD20A0015. South Dublin County Council Official link · not recently checked Exact official source shared from the planning and approval record.Open official planning file · external
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-307303-20. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Demolition of the existing dwelling known as 'San Guida' (225sq.m), ancillary garage (25sq.m), outbuilding (31sq.m) and garden walls; construction of a part 3 to part 4 storey apartment development (1,837sq.m) comprising 21 units (6 one bedroom and 15 two bedroom apartments) all with associated balconies/terraces; widening of the existing vehicular entrance along 'New Road'; 21 car parking spaces; bicycle parking; bin store, boundary treatments; hard and soft landscaping; plant; green roof; sub-station; lighting; solar photovoltaic panels and all other associated site works above and below ground
Floor area stated for this source: 1,881 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.