Commencement notice group
Housing commencement notices — Castlebar
Castlebar, Mayo
1 separate notice · latest notified commencement 17 Nov 2023 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 17 Nov 2023
- Latest notice
- 4 units
- Planning references supplied
- 22886
- Public location
- Castlebar, Mayo
Public source geography
Site location
- Public site / locality
- Castlebar, Mayo
- County
- Mayo
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
The exact official planning file is available below.
-
Official planning file Application details, decision and available documents Mayo County Council · reference 22886 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
DEMOLITION OF AN EXISTING (DERELICT) DWELLING HOUSE AND OUTBUILDINGS, THE CONSTRUCTION OF A PROPOSED NEW COMMERCIAL/RETAIL UNIT COMPRISING OF YOGA STUDIO (218SQM) AND SMALL COFFEE OUTLET (32SQM), INCLUDING CIRCULATION AND ANCILLARY SPACES, ASSOCIATED ILLUMINATED BUILDING SIGNAGE; THE CONSTRUCTION OF FOUR NO. DETACHED HOUSING UNITS (TWO NO. THREE-STOREY UNITS AND TWO NO. TWO-STOREY UNITS); ALL BOUNDARY TREATMENT AND HARD AND SOFT SITE LANDSCAPING INCORPORATING PEDESTRIAN WALKWAYS, VEHICLE AND CYCLE PARKING, IN-SITU PLANTERS WITH NATIVE PLANTING; CONNECTION TO THE EXISTING SERVICES (WATER AND FOUL WASTE), AND ALL ASSOCIATED SITE AND DEVELOPMENT WORKS
4 units · 921 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.