Site start
Site start — Balbriggan
Balbriggan, Dublin
2 commencement notices · latest start date 28 Sep 2015 · planning reference given
Planning F13A/0232 · Planning application
- Commencement notices
- 2
- Latest start date
- 28 Sep 2015
- Latest notice
- 1 unit
- Planning reference
- F13A/0232
- Location
- Balbriggan, Dublin
Location
Where the site is
- Area
- Balbriggan, Dublin
- County
- Dublin
Addresses on the notices
- ground floor
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Scoil Chormaic Community National School: Construction of a single - two storey primary school building,(4,368 sq.m gross floor area); with associated external signage. The constituent elements of the new school building comprise: (a) double height general purpose assembly hall / dining hall, (for school use), classrooms and administration offices at the ground floor, and staff room / toilets, library / meeting rooms at first floor, (b) two storey classroom element including offices / groups rooms / toilets and stores, (c) single storey special needs unit including class bases, central activities area, office and associated ancillary accommodation rooms; (iii) Site development works including vehicular / pedestrian & cycle access arrangements to provide car and bus set-down spaces; 104 No. standard car parking spaces, 4 No. universally accessible parking spaces and 198 No. cycle parking spaces (144No. of which are covered), services access and yard; (iv) New outdoor grass playing pitch and 7 No. ballcourts. The proposed development also includes hard & soft landscaping (including boundary treatments, school garden and site attenuation), ESB substation (23.5sq.m.), and associated site development and services works.
Colaiste Ghlor Na Mara Post Primary School: Construction of a single - three storey secondary school building, (9,938 sq.m gross floor area); with associated external signage. The constituent elements of the new school building comprise: (a) double height main physical education hall, (for school use); changing / storage / toilets at ground floor; fitness room at first floor level; (b) Triple height general purpose element including assembly hall / dining area / kitchenette at ground floor, and social spaces / circulation at first floor and second floors; (c) 3No.three storey classroom elements including special needs classrooms / central activity spaces / associated accommodation, lecture and workshop rooms, administration and pastoral offices, meeting rooms and stores
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.