Site start

Housing site start — Ballincollig

Ballincollig, Cork

6 commencement notices · latest start date 08 Dec 2025 · planning reference given

Planning P8.HCP.25.05

Commencement notices
6
Latest start date
08 Dec 2025
Latest notice
16 units
Planning reference
P8.HCP.25.05
Location
Ballincollig, Cork

Location

Where the site is

Area
Ballincollig, Cork
County
Cork

Addresses on the notices

  • Innishmore, Ballincollig, Cork
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

The construction of Block 1 of the Innishmore Gardens Residential Development, which consists of 16 no. residential units, comprising of 6 no. one-bedroom & 2 no. two bedroom ground floor apartments as well as 6 no. two-bedroom & 2 no. three bedroom maisonettes.

Work stated for this notice 16 units Explicit phase quantity stated by the source.

Floor area stated for this source: 1,408 m².

Planning reference P8.HCP.25.05
Notice 2 Seven-day notice

The construction of 1 no. two bedroom ground floor apartment (Unit 47) & 1 no. three bedroom maisonette (Unit 48) forming part of Block 5 of Innishmore Gardens Residential Development.

Work stated for this notice 2 units Explicit phase quantity stated by the source.

Floor area stated for this source: 194 m².

Planning reference P8.HCP.25.05
Notice 3 Seven-day notice

The construction of 1 no. two bedroom ground floor apartment (Unit 56) & 1 no. three bedroom maisonette (Unit 55) forming part of Block 5 of Innishmore Gardens Residential Development

Work stated for this notice 2 units Explicit phase quantity stated by the source.

Floor area stated for this source: 194 m².

Planning reference P8.HCP.25.05
Notice 4 Seven-day notice

The construction of 1 no. two bedroom ground floor apartment (Unit 30) & 1 no. three bedroom maisonette (Unit 29) forming part of Block 3 of Innishmore Gardens Residential Development.

Work stated for this notice 2 units Explicit phase quantity stated by the source.

Floor area stated for this source: 194 m².

Planning reference P8.HCP.25.05
Notice 5 Seven-day notice

The construction of Block 4 of the Innishmore Gardens Residential Development, which consists of 16 no. residential units, comprising of 6 no. one-bedroom & 2 no. two bedroom ground floor apartments as well as 6 no. two-bedroom & 2 no. three bedroom maisonettes.

Work stated for this notice 16 units Explicit phase quantity stated by the source.

Floor area stated for this source: 1,408 m².

Planning reference P8.HCP.25.05
Notice 6 Commencement notice

The Innishmore, Ballincollig proposed development includes the construction of 18 no. dwellings, comprising of 1 no. 4 bed house & 17 no. 3 bed houses and all ancillary site works. The proposed houses will be 2 storeys in height and are located at Innishmore, Ballincollig, Cork.

Work stated for this notice 18 houses Explicit phase quantity stated by the source.
Planning reference P8.HCP.25.05

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.