Commencement notice group

Commencement notices — Saggart

Saggart, Dublin

1 unique commencement event · latest notified commencement 12 Oct 2021 · planning reference supplied

View full project timeline

Unique commencement events
1
Latest notified commencement
12 Oct 2021
Latest notice
2,303 m²
Planning references supplied
SD18A/0180
Public location
Saggart, Dublin

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
1
  1. Completion certificate recorded — source scope not stated South Dublin County Council · commencement CN0082217SD Certificate CC00000052855SD · First observed in the official monthly source 2021-10 3 units stated for this certificate · One certificate representation

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Saggart, Dublin
County
Dublin

Notice location variants

  • the existing reservoir site at Saggart and associated upgrade works CN0082217SD
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file South Dublin County Council planning record Application details, status and decision record for SD18A/0180. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0082217SD BCMS open-data feed

Irish Water has identified a requirement to provide additional effective storage of 100Ml (100,000m3) at the existing reservoir site at Saggart and associated upgrade works. This is to provide security of supply and resilience by the provision of sufficient storage capacity at the site for operations and transfer of treated water from the complex to strategic service reservoirs in the Greater Dublin Area. A new On-Site Electro Chlorination Plant building (OSEC building) housing a new replacement secondary chlorination plant is also required as the existing chlorination plant has reached the end of its service life. The new OSEC building shall house an ESB substation, chlorination plant and associated equipment, de-chlorination plant, a backup power generator, controls and welfare facilities. The development shall comprise in summary the following works (non-exhaustive list): Section 1 Works: • 100,000m3 effective capacity covered potable water reservoir in two compartments with integrated inlet and outlet valve houses; • New OSEC building; • Diversion of existing 1600mm diameter pipeline to connect to the existing 4.5Ml reservoir; • New pipelines to connect existing inlet and outlet supplies to new reservoir; • Re-laying of a section of the existing overflow/drainage pipeline and provision of overflow attenuation area and overflow de-chlorination system; • New scour pipeline to connect to existing foul sewer on Páirc Mhuire; • Surface water collection systems and attenuation tank; • Foul collection system connecting to the existing system on site; • New watermain for fire hydrants and supply to new OSEC building; • Temporary relocation of above ground kiosks for water quality sampling; • Demolition of existing buried storage reservoirs; • Demolition of redundant above ground buildings/structures; • Site hardstanding and access roads / pathways on the site; • New entrance from Castle Road. Section 2 Works: • Refurbishment of existing OSEC building; • Reinstatement wo

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 2,303 m².

Planning reference SD18A/0180

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.