Site start

Housing site start — Sandymount

Sandymount, Dublin

1 commencement notice · start date 25 Jan 2017 · planning reference given

Planning 2415/16

Commencement notices
1
Latest start date
25 Jan 2017
Latest notice
Scale not stated
Planning reference
2415/16
Location
Sandymount, Dublin

Location

Where the site is

Area
Sandymount, Dublin
County
Dublin

Addresses on the notices

  • first floor level to the side an rear of the existing house
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

The construction of a new two bedroom extension at first floor level to the side an rear of the existing house. The roof over the proposed extension to have the same profile as the existing roof with a flat roof over part of the proposed rear first floor bedroom

Work stated for this notice Scale not stated for this notice.
Planning reference 2415/16

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.