Commencement notice group

Building extension commencement notices — BALLINA

BALLINA, Mayo

1 separate notice · latest notified commencement 31 Jan 2018 · planning reference supplied

Source notices
1
Latest notified commencement
31 Jan 2018
Latest notice
2 units
Planning references supplied
17/805
Public location
BALLINA, Mayo

Public source geography

Site location

Public site / locality
BALLINA, Mayo
County
Mayo

Public site labels seen across the notices

  • ROOF LEVEL

No usable public source coordinate is available for this notice group.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

The exact official planning file is available below.

  • Official planning file Application details, decision and available documents Mayo County Council · reference 17/805 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external
Planning reference17/805

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0035441MO BCMS open-data feed

CONSTRUCTION OF A NEW 1 STOREY (197SQM) ANALYTICAL LABORATORY EXTENSION TO THE EXISTING PRODUCTION AND ADMIN FACILITY ON THE WEST SIDE OF THE BUILDING. IT ALSO INCLUDES A NEW SINGLE STOREY (115SQM) EXTENSION TO THE EXISTING LOCKER/CHANGING AREA TO THE NORTH AND RELOCATION OF 63 CAR PARKING SPACES WITHIN THE EXISTING CAR PARK DEMISE. THE PROPOSED LABORATORY BUILDING WILL BE LINKED VIA CORRIDORS TO THE EXISTING PRODUCTION AND ADMIN BUILDING. THIS APPLICATION PROPOSES A PARAPET HEIGHT OF 7.15M ABOVE GRADE. THE PROPOSAL WILL INCLUDE A 3M FUME DISCHARGE AND ROOM CONDENSERS AT ROOF LEVEL. THE PROPOSED LOCKER EXTENSION WILL INCLUDE FOR A PARAPET OF 5.8M ABOVE GRADE TO TIE IN WITH THE EXISTING FACILITY. Project Execution Strategy: Enabling Works Contract & Main Works Contract As per Section 8.5 and 4.7 of The Code of Practice for Inspecting and Certifying Buildings and Works, it is proposed to have a phased completion and change of builder. This is the commencement notice for both phases 1 & 2

2 units · stated on this notice

Planning reference 17/805

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.