Site start
Housing site start — Blackrock
Blackrock, Dublin
1 commencement notice · start date 07 Jun 2022 · planning reference given
Planning D21A/0454 · Planning application
- Commencement notices
- 1
- Latest start date
- 07 Jun 2022
- Latest notice
- 1 house
- Planning reference
- D21A/0454
- Location
- Blackrock, Dublin
Location
Where the site is
- Area
- Blackrock, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Permission is sought. The development consists of: demolition of existing bungalow (101.4 sqm,) attached garage and sheds (18.1 sq.); reduction of ground levels to front of site to provide level access to new dormer style dwelling house (268.8 sqm over two floors) with attached single storey garage (20.3 sq.m); 3 No. dormer windows to front (North) elevation; rooflights and solar collector panels to rear; Alterations to landscaping including widening of existing vehicular access to 3.5m and alterations to front garden boundary wall; provision of 2m high fencing in stepped sections along Eastern boundary with hedge planting to all boundaries; new garden shed and external storage; and associated site works.
Floor area stated for this source: 280 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.