Site start

Housing site start — Portlaoise

Portlaoise, Laois

3 commencement notices · latest start date 23 Sep 2026 · planning reference given

Planning 25/60385 · Planning application · Council file · external

View full project timeline

Commencement notices
3
Latest start date
23 Sep 2026
Latest notice
25 houses
Planning reference
25/60385
Location
Portlaoise, Laois

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Portlaoise, Laois
County
Laois

Addresses on the notices

  • Port Laoise, Laois
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Laois County Council planning record Application details, status and decision record for 25/60385. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

The development will consist of the provision of 25 residential dwellings (sub phase) including ancillary car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; lighting; and all associated site and development works above and below ground.

Work stated for this notice 25 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 3,372 m².

Planning reference 25/60385 Developer stated: Bircrest Limited
Notice 2 Commencement notice

The development will consist of the provision of 39 residential dwellings (sub phase) including ancillary car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; pumping station; lighting; and all associated site and development works above and below ground.

Work stated for this notice 39 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 4,854 m².

Planning reference 25/60385 Developer stated: Bircrest Limited
Notice 3 Commencement notice

The development will consist of the provision of 7 residential dwellings of 92 No.residential dwellings including ancillary car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; pumping station; lighting; and all associated site and development works above and below ground.

Work stated for this notice 7 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 1,024 m².

Planning reference 25/60385 Developer stated: Bircrest Limited

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.