Commencement notice group

Building extension commencement notices — Hospital

Hospital, Limerick

1 separate notice · latest notified commencement 26 Sep 2018 · planning reference supplied

Source notices
1
Latest notified commencement
26 Sep 2018
Latest notice
280 m²
Planning references supplied
161069
Public location
Hospital, Limerick

Public source geography

Site location

Public site / locality
Hospital, Limerick
County
Limerick
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning reference161069

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0044219LL BCMS owner-supplied export

Provision of new shop front & associated signage, demolition of 35m sq. of stores & construction of 97m sq extension to rear of existing shop unit new connection to local authority foul & surface water sewers and all ancillary works.

280 m² · stated on this notice

Planning reference 161069 Builder stated: Abercorn Construction & Maintenance Developer stated: Michael Francis O Sullivan Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.