Site start
Building extension site start — Dalkey
Dalkey, Dublin
1 commencement notice · start date 28 Jun 2023 · planning reference given
Planning D23B/0069 · Planning application
- Commencement notices
- 1
- Latest start date
- 28 Jun 2023
- Latest notice
- 1 unit
- Planning reference
- D23B/0069
- Location
- Dalkey, Dublin
Location
Where the site is
- Area
- Dalkey, Dublin
- County
- Dublin
Addresses on the notices
- this detached bungalow - all under Reg
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Amendments and modifications to the permission granted for a garage conversion, single floor extension and conversion of the attic at this detached bungalow - all under Reg. Ref. D21B/0655, The a m e n d m e n t s to include: retention of garage, no bay extension to front, reduced demolitions, reduced ground floor extension - the overall habitable ground floor reduced from permitted 193sqm to 171sqm, reducing 2 permitted dormers to one central dormer on north elevation. 3 Velux omitted from south elevation of roof and one additional to elevation to North. Reduction in proposed fenestration to rear/east & north elevations. Some internal modifications and all associated demolitions, decoration, drainage and site works.
Floor area stated for this source: 14 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.