Site start

Housing site start — Killeshin

Killeshin, Laois

2 commencement notices · latest start date 30 Nov 2018 · planning reference given

Planning 16427 · Council file · external

Commencement notices
2
Latest start date
30 Nov 2018
Latest notice
8 houses
Planning reference
16427
Location
Killeshin, Laois

Location

Where the site is

Area
Killeshin, Laois
County
Laois
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

construct 25 houses; 7 no. four bed two storey detached, 10 no. four bed two storey semi detached and 8 no. three bed two storey semi detached; connected to existing service

Work stated for this notice 8 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 8,428 m².

Planning reference 16427
Notice 2 Commencement notice

construct 25 houses; 7 no. four bed two storey detached, 10 no. four bed two storey semi detached and 8 no. three bed two storey semi detached; connected to existing service

Work stated for this notice 7 houses Explicit phase quantity stated by the source.
Planning reference 16427

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.