Commencement notice group

Commencement notices — Doonamona

Doonamona, Mayo

1 separate notice · latest notified commencement 22 Oct 2025 · planning reference supplied

Source notices
1
Latest notified commencement
22 Oct 2025
Latest notice
Scale not stated
Planning references supplied
P25/38
Public location
Doonamona, Mayo

Public source geography

Site location

Public site / locality
Doonamona, Mayo
County
Mayo
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning referenceP25/38

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0134971MO BCMS open-data feed

Upgrade of raw water pumps and controls, modification of underground tanks to provide a dedicated raw water tank, installation of equipment to improve process including a new flocculation tank, clarification tank, dissolved air flocculation. UV reactor dedicated chemical delivery area, and associated pumps, piping and valves and accessories. Construction of solids management consisting of tank for settlement and associated pumps and infrastructure. Installation of new concrete slab and installation of new sludge holding tank (45m3), settlement tank, sludge balancing tank, alum tank, DAF and all associated ancillary works and associated engineering works. Works also include the installation of pumps and pipework to the treated water storage tank including a scrubber within the Callow Water Reservoir site

Scale not stated on this notice

Planning reference P25/38

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.