Site start
876 m² building, Bishopstown
Bishopstown, Cork
1 commencement notice · start date 08 Aug 2019 · no planning reference given
- Commencement notices
- 1
- Latest start date
- 08 Aug 2019
- Latest notice
- 876 m²
- Planning references
- None given
- Location
- Bishopstown, Cork
Location
Where the site is
- Area
- Bishopstown, Cork
- County
- Cork
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
The proposed works consists of the material alteration of the existing Heavy Vehicle Mechanic’s Workshop with-in the existing Cork Training Centre, (formerly FÁS), in Bishopstown, Cork. Works will be carried out within the existing building with the removal of internal walls to allow the existing HVM workshop to expand into adjoining workshops.
Floor area stated for this source: 876 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.