Site start
Building extension site start — Dublin
Dublin 2, Dublin
1 commencement notice · start date 17 Aug 2018 · planning reference given
Planning 3903/17
- Commencement notices
- 1
- Latest start date
- 17 Aug 2018
- Latest notice
- 523 m²
- Planning reference
- 3903/17
- Location
- Dublin 2, Dublin
Location
Where the site is
- Area
- Dublin 2, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
7-Day Notice - demolition and removal of the existing second floor substandard temp structure (i) new second and third floor to the rear of existing four storey building (ii) new fourth floor and new set back fifth floor to rear and over existing building all to accommodate a total of 19 no. short term accommodation bedrooms over JJ’s pub in a six storey building over basement (iii) new extension to basement to facilitate new lift core and stairs serving all floors (iv) internal modifications and refurbishment on all floors to facilitate new development use (v) renovation of pub, new pub facade facing onto Longford Street Little and minor alterations to existing facade facing onto Aungier Street. (vi) new finishes to include part architectural metal cladding and self coloured render with new windows throughout along with all ancillary works necessary to facilitate the development.
Floor area stated for this source: 523 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.