1 unique commencement event · latest notified commencement 18 Mar 2024 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 18 Mar 2024
- Latest notice
- 70 m²
- Planning references supplied
- None stated
- Public location
- Ballina, Tipperary
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Ballina, Tipperary
- County
- Tipperary
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Significant renovation works, material alterations (shell & core) & fire safety upgrade works, described as: a) Replacement of fire door sets throughout the building b) Removal of existing upper floor & replacement with new compartment floor construction c) Installation of new mechanical & electrical installations including i) Fire Alarm & Detection System ii) Emergency Lighting iii) Electrical Installation - rewire entire building including lights, sockets, switches etc. iv) Gas Supply – new rerouted supply line, meter & associated automatic shutoff v) Proprietary Fire Suppression System to commercial Kitchen Area d) Replacement of existing stairs serving upper floor & compartmentation of same (within existing building constraints) e) Upgrading of fire resistance to existing escape corridor (note existing insulated steel door to Keg Room that cannot be relocated / fire rated, but is low risk) f) Removal of existing damaged external roof escape gantry g) Replacement single ply roof covering to flat roofed areas h) Fire retardant treatment of existing thatch roof covering to roadside pitched roof i) Re-lining & certification of stoves & flues to Pub Areas j) Removal of existing Gas Fire to Dining Area k) Creation of “Open Pass” between Kitchen & Dining Area (thus change in existing fire strategy of separation of Kitchen from Dining Area) l) Replacement of existing rooflight units with Rooflights glazed with glass (not thermoplastic) m) Provision of Openable Window to Stair Landing n) Removal of existing Gas Storage Tank from rear yard area
Floor area stated for this source: 70 m².