Commencement notice group

Commercial commencement notices — Cork

Cork, Cork

2 unique commencement events · latest notified commencement 25 May 2026 · planning reference supplied

View full project timeline

Unique commencement events
2
Latest notified commencement
25 May 2026
Latest notice
173 m²
Planning references supplied
2342199
Public location
Cork, Cork

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
2
Exact completion events
0

Planning 2342199 — CONDITIONAL · Decision 2023-09-25 · Final grant 2023-11-06

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Cork, Cork
County
Cork

Notice location variants

  • Unit 2A, Saint Patricks Wollen Mills, Douglas, Cork
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Cork City Council planning record Application details, status and decision record for 2342199. Cork City Council Official link · last checked 02 Aug 2026 Exact official source shared from the planning and approval record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Alterations and extension to existing commercial unit for Cafe Restaurant including change of use of a vacant retail unit to a cafe/restaurant, construction of single-storey extension and alterations to existing building and all associated site works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 173 m².

Planning reference 2342199 Developer stated: GP Joy Vino Ltd
Notice 2 Commencement notice (owner-supplied)

Change of use from a vacant retail unit to a café/restaurant, (previously granted under 17/4800, and for the construction of a single-storey extension, outdoor covered area, alterations to north and east elevations, canopy, new signage, bin storage, new gates, alterations of the existing internal layout at Unit 2A, Saint Patricks Wollen Mills, Douglas, Cork

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 281 m².

Planning reference 23/42199 Developer stated: GP Joy Vino Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.