Commencement notice group
Housing commencement notices — Dublin
Dublin 4, Dublin
1 unique commencement event · latest notified commencement 09 Mar 2026 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 09 Mar 2026
- Latest notice
- 267 m²
- Planning references supplied
- None stated
- Public location
- Dublin 4, Dublin
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dublin 4, Dublin
- County
- Dublin
Notice location variants
- first floor to the rear with alterations to the roof profile CN0139381DC
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
The development will consist of refurbishment of the existing house including internal alterations to layout. The demolition of a shed and garden room to the rear and a single-storey extension to the side and rear. The construction of a new single-storey kitchen extension to the side and rear of the house. The construction of a bathroom extension at first floor to the rear with alterations to the roof profile. The construction of a single-storey structure to accommodate a plant area and bicycle shed.
Floor area stated for this source: 267 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.