Site start
Housing site start — Castleknock
Castleknock, Dublin
1 commencement notice · start date 12 Jul 2021 · planning reference given
Planning FW20B/0083 · Planning application
- Commencement notices
- 1
- Latest start date
- 12 Jul 2021
- Latest notice
- Scale not stated
- Planning reference
- FW20B/0083
- Location
- Castleknock, Dublin
Location
Where the site is
- Area
- Castleknock, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Alterations and changes to an as granted planning application, planning reference number FW19B/0057 ( (i) Demolition of existing single storey garage to the side (ii) Demolition of existing single storey conservatory to the rear (iii) Demolition of an existing single storey extension to the side and rear of the house (iv) Demolition of existing single storey boiler house structure to the rear (v) Construction of a new part one-storey, part two-storey extension to the side and rear of the existing house (vi) Construction of a new single storey boiler house structure (vii) All associated site works), the alterations to include: a. Revised dwelling plans, sections and elevations; b. Revised site layout plans and all associated site development works
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.