Site start

Building extension site start — Rathgar

Rathgar, Dublin

1 commencement notice · start date 20 Jan 2017 · planning reference given

Planning WEB1261/16

Commencement notices
1
Latest start date
20 Jan 2017
Latest notice
1 unit
Planning reference
WEB1261/16
Location
Rathgar, Dublin

Location

Where the site is

Area
Rathgar, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

a) demolition of single-storey garage extension to west, single-storey extension to north and single-storey extension to north-east, (b) construction of new two-storey, pitch roofed extension to west of 108 sq. m., comprising garage at Ground Floor level and Granny Flat and Master En-Suite Bathroom at First Floor level, (c) construction of single-storey flat roofed extension to north and north-east of 129 sq. m. and involving enlargement of existing kitchen, dining, living and ancillary areas, (d) widening of existing vehicular entrance, and (e) all associated site works

Work stated for this notice 1 unit Explicit phase quantity stated by the source.
Planning reference WEB1261/16

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.