Site start
Housing site start — Balbriggan
Balbriggan, Dublin
1 commencement notice · start date 08 Dec 2021 · planning reference given
Planning F20A/0593 · Planning application
- Commencement notices
- 1
- Latest start date
- 08 Dec 2021
- Latest notice
- 126 m²
- Planning reference
- F20A/0593
- Location
- Balbriggan, Dublin
Location
Where the site is
- Area
- Balbriggan, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development consists of the construction of a New single story 4 Bedroom Detached Dwelling (126m2) to the rear of the site, with New Vehicular Entrance exiting onto Chieftain’s Close, development shall include boundary treatments and associated site works.
Floor area stated for this source: 126 m².
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.