Commencement notice group

Housing commencement notices — Cork

Cork, Cork

1 separate notice · latest notified commencement 15 Apr 2026 · planning reference supplied

Source notices
1
Latest notified commencement
15 Apr 2026
Latest notice
1 home
Planning references supplied
25/44370
Public location
Cork, Cork

Public source geography

Site location

Public site / locality
Cork, Cork
County
Cork
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning reference25/44370

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0140805CY BCMS owner-supplied export

New single storey side extension, new french window to rear elevation and new prep area, (2) Demolition of existing side gable wall to make way for single storey side extension and rear elevational alterations which consists of removal of rear double sliding door and single rear window, (3) Material altertaiosn to ground floor plan for an open plan kitchen, (4) To the existing two storey dwelling house and all ancillary site works

1 home · 13 m² · stated on this notice

Planning reference 25/44370

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.