Site start
Commercial site start — Freshford
Freshford, Kilkenny
1 commencement notice · start date 15 Feb 2017 · planning reference given
Planning 15180 · Council file · external
- Commencement notices
- 1
- Latest start date
- 15 Feb 2017
- Latest notice
- 1 unit
- Planning reference
- 15180
- Location
- Freshford, Kilkenny
Location
Where the site is
- Area
- Freshford, Kilkenny
- County
- Kilkenny
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Demolition of existing motor services retail building of 96m2, demolition of existing store/workshop of 108m2, removal of all existing underground and overground fuel tanks and all associated fuel lines and services, removal of existing 2 No. fuel dispensing pump islands and demolition of existing canopy overhead of same. Permission is further sought for construction of a new 277m2 single storey petro service/convenience store building with internal ATM facility (167m2 net. retail area) including a 22m2 off liscence facility, a 22m2 seating area for consumption of on site prepaired deli food plus associated prep./storage areas, staff facilities and customer washroom facilities of 68m2. New forecourt area to consist of service area plus 2 no. multi fuel pump dispensing islands with new overhead canopy with illuminated signage, illuminated roadside signage, plus a new separate commercial/kero/mgo/agri-fuel dispensing pump. Instalation of a 40,000 litre unleaded petrol underground storage tank plus an additional 50,000 litre underground storage tank, split as 40,000 litre diesel, 5,000 liters Kerosene and 5,000 litres for Marked Gas Oil. Plus all associated fuel lines, ventilation and access points. 15 No. customer car parking spaces in addition to new staff parking and delivery/loading area and storage compound, new rear access road plus all associated site works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.