Site start

The application relates to the proposed subdivision

Cork, Cork

1 commencement notice · start date 07 Jul 2026 · no planning reference given

Commencement notices
1
Latest start date
07 Jul 2026
Latest notice
2,821 m²
Planning references
None given
Location
Cork, Cork

Commencement and completion records

Planning, start and completion

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Planning applications
Links to official records
0
Links between applications
Repeat copies merged
Completion certificates

Location

Where the site is

Area
Cork, Cork
County
Cork

Addresses on the notices

  • Douglas Shopping Centre, Douglas
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

Notice 1 Commencement notice

The application relates to the proposed subdivision and reconfiguration of the existing Tesco retail unit at Douglas Shopping Centre, Douglas. The development will facilitate the introduction of a Decathlon retail unit at mezzanine floor level, together with a partial area at ground floor level along with the relocation of the bake off area to the BOH and inclusion of DRS area.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 2,821 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.