Site start
Housing site start — Dublin
Dublin 2, Dublin
1 commencement notice · start date 23 Jun 2021 · planning reference given
Planning 2154/20 · Planning application
- Commencement notices
- 1
- Latest start date
- 23 Jun 2021
- Latest notice
- 1 unit
- Planning reference
- 2154/20
- Location
- Dublin 2, Dublin
Location
Where the site is
- Area
- Dublin 2, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of the change of use from commercial to residential at first and second floor, with the incorporation of the existing apartment at third floor level into combined 4-bed single residential use, the provision of conservatory at rear ground floor level, the provision of a spiral stair case linking first floor rear return to garden, provision of new roof light over rear return, provision of 2 no. roof lights to third floor, internal alterations inc provision of new bathrooms, restoration of existing windows and doors inc provision of a fanlight over front door to match adjacent houses.
Floor area stated for this source: 376 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.