Commencement notice group

Building extension commencement notices — Dublin

Dublin, Dublin

1 unique commencement event · latest notified commencement 23 Jan 2026 · planning basis not stated

Unique commencement events
1
Latest notified commencement
23 Jan 2026
Latest notice
190 m²
Planning references supplied
None stated
Public location
Dublin, Dublin

Planning-anchored public geography

Site identity and location

Canonical public locality
Dublin, Dublin
County
Dublin

Notice location variants

  • rear & side CN0137379DC
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

CN0137379DC BCMS open-data feed

(a) Demolition of existing chimney stack, external store and single storey extension at rear & side. (b) Construction of new two storey extension at rear & side of property. (c) Alteration of existing hipped roof structure to form new gable roof, and conversion of existing attic space with dormer at rear for ancillary domestic accommodation. (d) Widening of existing vehicular access from collins avenue to provide 2no. on site parking. (e) Internal alterations at ground & first floor levels along with associated site works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 190 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.