Commencement notice group

Housing commencement notices — Blackrock

Blackrock, Cork

1 unique commencement event · latest notified commencement 07 Oct 2024 · planning reference supplied

View full project timeline

Unique commencement events
1
2 public source rows · 1 duplicate representation consolidated
Latest notified commencement
07 Oct 2024
Latest notice
1 house
Planning references supplied
2342414
Public location
Blackrock, Cork

Verified project chain

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
0

Planning, commencement and completion remain separate exact-source events. Completion certificates are shown only after the official planning, commencement, certificate and PDF evidence chain passes; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Blackrock, Cork
County
Cork
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Cork City Council planning record Application details, status and decision record for 2342414. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion. 1 duplicate source representation is consolidated under the canonical notice reference while every source remains visible beneath that event.

CN0120303CY 2 public source representations

(A) Partial demolition of two-storey rear return to the western end of the south/rear elevation of existing house (NIAH Reg. No. 20868098), (B) Demolition of existing two-storey modern extension and single-storey flat roof extension with low height adjoining masonry wall (overall demolition area=87.20 m.sq), (C) Removal and relocation of existing rear skylight, (D) Construction of a new single and two-storey flat roof extension with glass canopy over open atrium, (E) Associated roof alterations and repairs to existing building, and (F) All associated site and landscape works.

Work stated for this notice 1 house Explicit phase quantity stated by the source.

Floor area stated for this source: 245 m².

Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.

Planning reference 2342414
Source representations
  • BCMS open-data feed · CN0120303CY Notified commencement: 2024-10-07 Source checked: 2026-06-09T15:11:14Z Phase quantity stated in this source representation: 1 houseFloor area stated in this source representation: 245 m² Open source record Open official source
  • NBCO historical file · NBCO:CN0120303CY Notified commencement: 2024-10-07 Source checked: 2026-08-13T05:18:58Z Source unit value stated in this representation: 1 houseFloor area stated in this source representation: 245 m² Open source record Open official source

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.