Site start

Building extension site start — Kiltimagh

Kiltimagh, Mayo

1 commencement notice · start date 15 Mar 2019 · planning reference given

Planning P17/103

Commencement notices
1
Latest start date
15 Mar 2019
Latest notice
947 m²
Planning reference
P17/103
Location
Kiltimagh, Mayo

Location

Where the site is

Area
Kiltimagh, Mayo
County
Mayo

Addresses on the notices

  • Chapel Street, Kiltimagh, County Mayo
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Demolition of existing single- storey changing rooms, construction of a two storey extension to existing school building with minor modifications to existing building and site works and services at Chapel Street, Kiltimagh, County Mayo.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 947 m².

Planning reference P17/103

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.