Site start

Housing site start — Clane

Clane, Kildare

1 commencement notice · start date 16 Apr 2018 · planning reference given

Planning 17/137 · Council file · external

View full project timeline

Commencement notices
1
Latest start date
16 Apr 2018
Latest notice
1 house
Planning reference
17/137
Location
Clane, Kildare

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Clane, Kildare
County
Kildare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Kildare County Council planning record Application details, status and decision record for 17/137. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

(a) The construction of a new single storey domestic extension to the rear and side of the existing dwelling with a floor area of 120.1m2; (b) The construction of a new single storey domestic porch extension to the front of the existing dwelling with a floor area of 3.3m2; (c) Modifications to the existing dwelling to include: -Amendments to the existing hipped roof to allow for gable walls either end (east and west); -The installation of new roof windows to the front (south) elevation; -The removal of an existing chimney and the construction of a new chimney along the roof ridge line; -The replacement of all existing external windows and doors (including the existing garage door) with newly proportioned windows and doors; and -Internal alterations to include the conversion of the existing garage (with a floor area of 13.4 sq.m.) to habitable accommodation; (d) The relocation of existing detached single storey corrugated metal / timber sheds from the east side to the west side of the existing dwelling; (e) The installation of a new wastewater treatment plant and associated percolation area that is to replace an existing septic tank that currently serves the existing dwelling; (f) The addition of stone cladding to the piers and walls of the existing vehicular site entrance; (g) All associated site development works.

Work stated for this notice 1 house Explicit phase quantity stated by the source.

Floor area stated for this source: 247 m².

Planning reference 17/137

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.