Site start
Commercial site start — Portlaoise
Portlaoise, Laois
1 commencement notice · start date 14 Oct 2019 · planning reference given
Planning 18/216 · Council file · external
- Commencement notices
- 1
- Latest start date
- 14 Oct 2019
- Latest notice
- 2,389 m²
- Planning reference
- 18/216
- Location
- Portlaoise, Laois
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 18/216 Laois County Council
Exact appeal 303040 · Grant permission with revised conditions · 2019-06-25 · Open official case
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Portlaoise, Laois
- County
- Laois
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Laois County Council planning record Application details, status and decision record for 18/216. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of (a) new vehicular entrance and egress road, secondary egress only point, with improvement works to existing road network at Togher, (b) provision of a two storey building with retail unit, roof top solar panels, a foodcourt and associated drive thru, communal seating area, office, wc facilities, kitchen and food preparation and storage areas, storage, staff facilities, plant room, substation and associated illuminated signage (floor area: 1220 sq. m. ) ; (c) 6 no. petrol/diesel filling pumps with overhead canopy, (d) 2. no. illuminated totem pole with associated signage 9e) pumping stations and associated access road (f) all associated site works including hard and soft landscaping, boundary treatment, car parking, HGV and coach parking, lighting. rain water harvesting system and underground rain water harvesting tanks, electric car charging points, storm water runoff petrol inceptor and attenuation system, cycle stands, HGV refuelling point, fuel vents and underground fuel tanks
Floor area stated for this source: 2,389 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.